List of Some of Our Completed and On Going Projects.
Project Name Completion Date Project Description

Pictures

On Going M & E
On Going

Minebea Phase II

M & E

Nov 2014

YAZAKI Wiring Factory CAP PHASE-II

M & E

Nov 2014

AJINOMOTO PHASE-II

Civil Works Construction and Mechanical & Electrical

 
July 2014

Civil Works Construction and Mechanical & Electrical

May 2014 Plumbing and Sanitary System

MikasaFactory KKSEZ

Oct 2014

Mechanical & Electrical System

2014 M&E
Eastern Steel 2014 M&E  
Sept 2014 MECHANICAL & ELECTRICAL WORKS  
Taiya Kogyo November 2013

Mechanical and Electrical work

TAICA

July 2013 Electrical
Sept 2013 M&E
May 2013 Electrical Works
Dec 2012

Chiller TRANE brand Cap: Chillers 2x170USRT, AHU 6x58000CHM

Chiller pipe size 350A, Duct size 1.2m x 1m, Spiral Duct size 500mm

Dec 2012 Mechanical & Civil Works
Dec 2012

Minebea Phase I

Mechanical & Electrical – Ventilation – Phone System

Dec 2012 Construction of Main Building & Dormitory
May 2012 Mechanical & Electrical
May 2012 Mechanical & Electrical
 Jan 2012  Waste Water Treatment Plant
2011 Mechanical & Electrical Works  
2010 Electrical – Plumbing – Air conditioning
August 2008 Plumbing – Water Supply & Drainage – Deep well – Container water tank – Septic tank Storage tank – Hot & Cold water system – Hydrant – Sprinkler – Ventilation system  
March 2008 Cool Room – Electrical  
December 2007 Lightning Protection – Electrical – Mechanical – Control Panel - Auto Gate  
September 2007 Electrical – Air conditioning – Generator and CO2 in Generator Room – Alarm System – CCTV  
June 2007 Model House
Plumbing – Booster Pump – Fence
 
May 2007 Civil works – Plumbing  
April 2007 Electrical – Plumbing – Deepwell – Manhole  
April 2007 Electrical – HVAC – Air conditioning – Plumbing Sanitary System  
March 2007 Electrical – Air conditioning – Plumbing Sanitary System  
February 2007 Plumbing – Fire Fighting (Hydrant, Hose Reel & Sprinkle) – Air conditioning  
August 2006 Air conditioning  
May 2006 Electrical Renovation – Fire Fighting  
April 2006 M & E
Plumbing – Electrical – Air-con – Fire Fighting – Fire Alarm
April 2006 M & E
Plumbing – Electrical – Air-con – Fire Fighting – Fire Alarm
February 2006 CCTV – Data & Telephone Cable – Main Switch Board – Electrical Work  
May 2005 Pumping Station – Plumbing Sanitary – Gas System – Fire fighting – Drainage – Sewage
April 2004 Electrical – Air-conditioning – Plumbing Sanitary – Fire fighting – Lightning protection – Alarm System – Sound System – Key Telephone  
February 2004 Electrical – Air-conditioning – Plumbing Sanitary – Fire fighting – Lightning protection – Alarm System –Key Telephone  
June 2001 Electrical – Chiller Air-conditioning System - Oxygen System Generator  
November 2002 Fluids Mechanical – Plumbing Sanitary
Plumbing Sanitary Terminal A & B – Plumbing Sanitary VIP building – Car park Lighting & Fire fighting – Waste Water Treatment Plant – Cold Water Pumping Station – Sewage & Soil System – Gas Installation System
 
December 2000 Air field lighting – Power station – Water plant  

 

Chiller TRANE brand Cap: Chillers 2x170USRT, AHU 6x58000CHM

Chiller pipe size 350A, Duct size 1.2m x 1m, Spiral Duct size 500mm