what we can provide
Our services
Civil Works
MEP Installation
- Site Preparation and Excavation
- Foundation and Structural Work (Piling, Steel and Concrete Structures)
- Architectural Works (Finishes, Interior Fit-Outs)
- Façade and External Cladding Systems
- Pavement and Road Construction
- Landscaping and Outdoor Amenities
- Water Storage and Pumping Stations
- Drainage, Sewerage, and Stormwater Management
- Underground Utility Trenching (Power and Communication Conduits)
- Truck Scale and Weight Bridges
- Guard Houses, Security Gates, and Perimeter Fencing
- Factory and Industrial Buildings
- Power Plants and Energy Centres
- Administration Offices and Worker Housing
- Commercial Complexes (Shopping Malls, Hotels, and High-Rise Towers)
- Wastewater Treatment Plants (WWTP)
- Biomass Boiler and Steam Plant Construction
- HVAC (Heating, Ventilation, and Air Conditioning)
- Chiller systems (including VRV and water-cooled chillers)
- Air Handling Units (AHU) and Ventilation Fans
- Cooling Towers and Heat Exchangers
- Pre-insulated piping and ductwork fabrication
- Grease Trap Interceptors
- Fire Protection and Fire Suppression Systems (Sprinkler, Hose Reel, Clean Agent Novec 1230)
- BMS (Building Management Systems)
- Medium Voltage (MV) and Low Voltage (LV) Electrical Systems
- Generators, Transformers, and Busduct Installations
- Power Distribution Boards and Automatic Transfer Switches (ATS)
- Lighting and Façade Lighting Systems
- Emergency Power Systems (UPS, Diesel Generators)
- CCTV, PA, and Access Control Systems
- Fire Alarm and Detection Systems
- Data & Telecommunications Networks
- Lightning Protection and Earthing Systems
- Complete Plumbing & Sanitary Fixture Installations
- Hot and Cold Water Distribution
- Wastewater Treatment Plants (WWTP)
- LPG Gas Systems and Storage Tanks
- Drainage Systems and Sewer Networks

Scope: Package MEP including chiller, ventilation, electrical systems, plumbing, fire safety, and more
Client: Angkor Dairy (Cambodia) Co., Ltd
Started: Feb 2025
Deadline: Jan 2026

Scope: Package MEP including air conditioning, fire protection, water treatment, electrical systems
Client: OISHI F&B (Cambodia) Co., Ltd
Started: Jul 2024
Deadline: Dec 2025

Scope: Package Building Work including administration offices, fuel station, staff parking, etc.
Client: Sihanoukville Autonomous Port
Started: Oct 2024
Deadline: Feb 2027

Scope: WWTP Civil Work including various tanks and integrated building
Client: Suvannaphum Investment (SI)
Started: Nov 2024
Deadline: Mar 2025
Other CURRENT PROJECTS
Our other projects include but are not limited to the following:
At DBD Engineering, we bring expertise, integrity, and innovation to every project. With a deep understanding of the construction industry and a strong network of trusted partners, we collaborate to provide tailored solutions across various fields of expertise.
Whether it’s structural engineering, civil construction works, or MEP installation, our team is committed to delivering excellence at every stage.
We believe in building more than just structures — we build lasting relationships. Our client-focused approach ensures that every project is handled with precision, timeliness, and a commitment to quality.
From concept to completion, we listen, strategise, and execute with a dedication to meeting your budgetary and project needs.
Proven Excellence – A 30-year track record of delivering high-quality solutions.
Client-Centered Service – Your vision is our priority, and we work to bring it to life.
Cost-efficient – Our services are competitively priced as we customise engineering solutions to our client’s needs and limitations without compromising on quality.
Past completed works
COMPLETED CIVIL WORKS
Wing Bank. PBC Monivong Branch Office


Client: Wing Bank Group
Started: March 2023
Completed: Jun. 2023
Biomass Boiler Plant for Heineken Factory




Client: BECIS Singapore
Started: Jan 2022
Completed: Sep 2022
Decathlon Store at
Aeon Mall 3

Scope: Complete fit out work including Architecture & MEP. Wall Partition. Slab. Sprinkler system. HVAC Duct and piping. Electrical: Low voltage. Plumbing & Sanitary. Interior finishes and others.
Client: Decathlon Cambodia
Started: Sep 2022
Completed: Dec 2022
B-QUIK Car Repair Services at AEON Mall Sen Sok

Client: Decathlon Cambodia
Started: Sep 2022
Completed: Dec 2022
COMPLETED MEP PROJECTS
Daikin Head Office, Phnom Penh

Scope: Package MEP. Supply and installation of Electrical, Plumbing, Fire Extinguisher, MVAC system.
Client: Daikin (Cambodia)
Started: Feb 2024
Completed: Jun 2024
Chip Mong Mega Mall 271





Scope: Package MEP: Complete MEP including Chiller 4500T, Sprinkler System, Façade Lighting, Optic Network Control
Client: Chip Mong Group
Started: Mar 2020
Completed: May 2022
Chip Mong 598 Mall The Park Land



Scope: Package MEP: Complete MEP Work including HVAC, Plumbing, Lighting, Fire Safety
Client: Chip Mong Group
Started: Mar 2020
Completed: Sep 2021
Chip Mong Sen Sok Mall



Scope: Package MEP: Complete MEP including Chiller, Generator, WWTP, BAS RMS system
Client: Chip Mong Group
Started: May 2019
Completed: Mar 2021
Tribe Hotel, Phnom Penh



Scope: Package MEP: 247 Guest rooms, BAS, VRV Air Conditioning, Heat Pump, Fire Safety
Client: SMPP
Started: Jan 2020
Completed: Sep 2021
Bodaiju Condominium Project A / B



Scope: Structural works as well as plumbing, fire protection, and fire alarm systems for Building A and Building B. 13 Floors.
Client: CREED
Started: Jan 2017
Completed: Dec 2018
Completed
OTHER PROJECTS






